Skip to main content

Market: Mining industry

Solution: Integrated fully turnkey pioneering camp accommodation

A mining company operating in Niger ordered a fully integrated redeployable turnkey construction camp capable of housing all employees working on-site. The camp was shipped to site where the Weatherhaven RCS team assisted with installation. It was required to provide:

  • Sleeping accommodation
  • A kitchen
  • Diner structures
  • Offices
  • External electrical reticulation
  • Containerised water purification plant with reverse osmosis and storage, and
  • A biological sewage treatment plant with parameter fencing.